8VAC20-780 ADMINISTRATION. 8VAC20-780 STAFF QUALIFICATIONS AND TRAINING. 8VAC20-780 PHYSICAL PLANT 8VAC20-780 STAFFING AND SUPERVISION. 8VAC20-780 PROGRAMS. 8VAC20-780 SPECIAL CARE PROVISIONS AND EMERGENCIES 8VAC20-780 SPECIAL SERVICES. 8VAC20-820 THE LICENSE 8VAC20-820 THE LICENSE PROCESS 8VAC20-820 HEARING PROCEDURES 8VAC20-770 BACKGROUND CHECKS 20 ACCESS TO MINOR?S RECORDS 22.1 BACKGROUND CHECKS, CODE, CARBON MONOXIDE 63.2 CHILD ABUSE AND NEGLECT
Comments:
An unannounced monitoring inspection was initiated and completed on 02/26/2024. The inspector was on site from 11:10am until 1:20pm.
There were 28 children, ages 7 months to 5 years old under the supervision of five staff. Children were observed during indoor free play, lunch time and naptime. Four children's records and three staff records were reviewed.
Information gathered during the inspection determined non-compliance with applicable standards or law, and violations are documented on the violation notice issued to the program.
If you have any questions about this inspection, please contact Nicole Scott, Licensing Inspector Phone-804.588.2372 Email- nicole.scott@doe.virginia.gov.
Based on observation, the center failed to ensure that hazardous substances, shall be kept in a locked place using a safe locking method that prevents access by children.
Evidence: 1.In classroom #4, the chemicals were unlocked above the sink.
Plan of Correction:
Chemicals was moved to a locked cabinet 2-26
Standard #:
8VAC20-780-320-B
Description:
Based on observation and interview, the center failed to have supply bathroom sinks with running warm water that does not exceed 120?F.
Evidence: In classrooms 2, 3 and 4 the classrooms had no hot water in the classroom sink or the bathroom sinks.
Plan of Correction:
Maintenace was called to look at the hot water and if cannot fix will get plumber 3-29
Standard #:
8VAC20-780-330-B
Description:
REPEAT VIOLATION Based on observation, the center failed to ensure that all climbable playground equipment had the required resilient surfacing.
Evidence: Observed non-measurable amount of resilient surfacing under the required fall zone. The required amount is 6 inches of resilient surfacing.
Plan of Correction:
Have mulch scheduled to meet the resilient surfacing requirements 3-29
Disclaimer:
This information is provided by the Virginia Department of Social Services, which neither endorses any facility nor guarantees that the information is complete. It should not be used as the sole source in evaluating and/or selecting a facility.
Find this content at:
http://www.dss.virginia.gov/facility/search/cc.cgi