Search for Child Day Care

|Return to Search Results | New Search |

Forest Hill Presbyterian Church Child Care Center
4401 Forest Hill Avenue
Richmond, VA 23225
(804) 230-2380

Current Inspector: Danielle Morrison (804) 929-3771

Inspection Date: Oct. 25, 2021

Complaint Related: Yes

Areas Reviewed:
22VAC40-185 PHYSICAL PLANT.
22VAC40-185 STAFFING AND SUPERVISION.

Comments:
An unannounced complaint inspection was conducted in response to a complaint that was received by licensing on 10/03/2021 regarding allegations in the area of building maintenance. The inspection was initiated and completed on 10/25/2021. On 10/25/2021, the inspector was on site from 9:30 am to 11:13 am.

The preponderance of the evidence gathered during the investigation supports the allegation; therefore, the complaint is determined to be valid. See the violation notice for more details. If you have any questions about this inspection, please contact the licensing inspector at (540) 430-0384.

Please complete the ?plan of correction? and ?date to be corrected? for each violation cited on the violation notice and return it to me within 5 business days from today. You will need to specify how the deficient practice will be or has been corrected. Just writing the word ?corrected? is not acceptable. Your plan of correction must contain: 1) steps to correct the noncompliance with the standard(s), 2) measures to prevent the noncompliance from occurring again; and 3) person(s) responsible for implementing each step and/or monitoring any preventative measures. Please do not use staff names; list staff by positions only.

Violations:
Standard #: 22VAC40-185-270-A
Complaint related: No
Description: Based on observation, the center did not ensure that areas and equipment of the center, inside and outside, were maintained in a clean, safe and operable condition.

Evidence:
1. Large areas of rust and cracked and peeling paint were observed in two of the bathroom stalls on each side of the children's toilets.

Plan of Correction: Areas in question were covered on 10-25-2021. Scraping and sanding occurred on 10-28-2021. Painting will be completed by 11-6-2021

Disclaimer:
This information is provided by the Virginia Department of Social Services, which neither endorses any facility nor guarantees that the information is complete. It should not be used as the sole source in evaluating and/or selecting a facility.


  Find this content at:
  http://www.dss.virginia.gov/facility/search/cc.cgi