Bedford Adult Day Center
1617 Oakwood Street
Bedford, VA 24523
(540) 586-8424
Current Inspector: Angela Marie Swink (276) 623-6575
Inspection Date: April 4, 2023
Complaint Related: No
- Areas Reviewed:
-
22VAC40-61 GENERAL PROVISIONS
22VAC40-61 ADMINISTRATION
22VAC40-61 PERSONNEL
22VAC40-61 SUPERVISION
22VAC40-61 ADMISSION, RETENTION AND DISCHARGE
22VAC40-61 PROGRAMS AND SERVICES
22VAC40-61 BUILDINGS AND GROUND
22VAC40-61 EMERGENCY PREPAREDNESS
22VAC40-80 THE LICENSE
22VAC40-80 THE LICENSING PROCESS
22VAC40-80 SANCTIONS
63.2 GENERAL PROVISIONS
63.2 PROTECTION OF ADULTS AND REPORTING
63.2 LICENSURE AND REGISTRATION PROCEDURES
63.2 CRIMINAL PROCEDURES
22VAC40-90 BACKGROUND CHECKS FOR ASSISTED LIVING FACILITIES
22VAC40-90 THE SWORN STATEMENT OR AFFIRMATION
22VAC40-90 THE CRIMINAL HISTORY RECORD REPORT
- Comments:
-
Type of inspection: Monitoring
Date of inspection and time the licensing inspector was on-site at the facility for each day of the inspection: 04/04/2023 1:30pm until 3:30pm
The Acknowledgement of Inspection form was signed and left at the facility for each date of the inspection.
Number of participants present at the facility at the beginning of the inspection: 23
The licensing inspector completed a tour of the physical plant that included the building and grounds of the facility.
Number of participant records reviewed: 4
Number of staff records reviewed: 3
Number of interviews conducted with participants: 1
Number of interviews conducted with staff: 1
An exit meeting will be conducted to review the inspection findings.
The evidence gathered during the inspection determined non-compliance with applicable standard(s) or law, and violation(s) were documented on the violation notice issued to the facility. The licensee has the opportunity to submit a plan of correction to indicate how the cited violation(s) will be addressed in order to return the facility to compliance and maintain future compliance with applicable standard(s) or law.
If the licensee wishes to provide a plan of correction: (i) type the plan on a separate Word document, (ii) identify the standard violation number being addressed, (iii) include the date the violation will be corrected, (IV) do not include any names or confidential information, and (V) return to the licensing inspector by email within five (5) business days of the exit interview.
Compliance with all applicable regulations and law shall be maintained and any areas of noncompliance must be corrected.
Within 15 calendar days of your receipt of the inspection findings (inspection summary, violation notice, and supplemental information), you may request a review and discussion of these findings with the inspector's immediate supervisor. To make a request for review and discussion, you must contact the licensing supervisor at the regional licensing office that serves your geographical area.
Regardless of whether a supervisory review has been requested, the results of the inspection will be posted to the DSS public website within 5 business days of your receipt of the Inspection Summary and/ or Violation Notice.
The department's inspection findings are subject to public disclosure.
Please Note: A copy of the findings of the most recent inspection are required to be posted on the premises of the facility.
For more information about the VDSS Licensing Programs, please visit: www.dss.virginia.gov
Should you have any questions, please contact Cynthia Ball-Beckner, Licensing Inspector at 540-309-2968 or by email at name cynthia.ball@dss.virginia.gov
- Violations:
-
Standard #: 22VAC40-61-230-D Description: Based on a review of participant records, the facility failed to ensure that all identified needs were addressed on participants plan of care (POC).
EVIDENCE:
1. The plan of care in the records for participants 1, 2 and 3 do not include all ADL needs or services to be provided that were identified on the participants assessments.Plan of Correction: The Director will revise the Participant Plan of Care to include all required elements. Correction target date: 5/2/23.
Standard #: 22VAC40-61-460-H Description: Based on observations made of the facility physical plant, the facility failed to ensure that hot water available to participants was maintained between 105'F and 120'F.
EVIDENCE:
1. The hot water from the sink in the #2 bathroom was reading 97.1'F on the day of inspection.Plan of Correction: The Director will ensure that the water temperature in restrooms is monitored daily to ensure that the temperature is within acceptable limits. Correction target date: 4/7/23. (We have already started monitoring and logging this daily.)
Disclaimer:
This information is provided by the Virginia Department of Social Services, which neither endorses any facility nor guarantees that the information is complete. It should not be used as the sole source in evaluating and/or selecting a facility.
This information is provided by the Virginia Department of Social Services, which neither endorses any facility nor guarantees that the information is complete. It should not be used as the sole source in evaluating and/or selecting a facility.