Click Here for Additional Resources
Search for Child Day Care
|Return to Search Results | New Search |

Bright Beginnings Childcare Center
81 & 85 Cleremont Drive
Fredericksburg, VA 22405
(540) 373-7791

Current Inspector: Morgan Bryson (540) 270-0057

Inspection Date: March 22, 2023

Complaint Related: No

Areas Reviewed:
8VAC20-780 Administration.
8VAC20-780 Staff Qualifications and Training.
8VAC20-780 Physical Plant.
8VAC20-770 Background Checks (8VAC20-770)
22.1 Background Checks Code, Carbon Monoxide

Comments:
An unannounced non-mandated focused inspection was conducted due to the center being on a Conditional License 3/22/2023 from 10:15am through 11:05am. There were 42 children directly supervised by 10 staff and all classrooms were in ratio. The physical plant, outdoor playground area, and 2 staff records were inspected. Previous corrective actions were verified. Children were observed painting bunny crafts and participating in center play. Positive interactions between children and staff were observed during this inspection. There was an abundant supply of age appropriate materials for the children and the center was clean and organized. Areas of non-compliance are identified in the Violation Notice.

Please complete the columns for "Plan of Correction" and "Date to be Corrected" for each violation cited on the Violation Notice, and then return a signed and dated copy to the licensing office by 5pm on 4/20/2023. Please email me at morgan.bryson@doe.virginia.gov with any questions.

Violations:
Standard #: 8VAC20-780-330-B
Description: Based on an inspection of the playground, it was determined that the mulch under and around play equipment was not resilient.

Evidence:
1. The depth of mulch was measured in two spots around the swing set on the larger playground and measurements were 0" and 2" of resilient surfacing.
2. The depth of mulch was measured in two spots around around the composite play structure on the larger playground and measurements were 1" and 0.5".
3. The 1' pink slide on the smaller playground only had 0.5" of resilient surfacing.
4. The 2' red slide on the smaller playground only had 0.5" of resilient surfacing.

Plan of Correction: Daily inspection of playgrounds to assure mulch is replaced under and around equipment.

Disclaimer:

A compliance history is in no way a rating for a facility.

The online compliance history includes only information after July 1, 2003. In addition, the online compliance history includes information regarding adverse actions that may be the subject of a pending appeal. An adverse action is not final until a provider has exhausted or waived all due process rights. For compliance history prior to July 1, 2003, or information regarding the status of pending adverse actions, please contact the Licensing Inspector listed in the facility's information. The Virginia Department of Social Services (VDSS) is not responsible for any errors in or omissions from the compliance history information.

Google Translate Logo
×
TTY/TTD

(deaf or hard-of-hearing):

(800) 828-1120, or 711

Top